WEEKS 0–6
01
Ground
Survey, permits and a final design meeting. The plot is levelled and the house is staked out with string, so you can stand in your future kitchen.

How we build
One team, one fixed price and one date for your keys, agreed before we start.
The six stages
Under each stage: what lands in your inbox that week.
WEEKS 0–6
01
Survey, permits and a final design meeting. The plot is levelled and the house is staked out with string, so you can stand in your future kitchen.

WEEKS 6–10
02
Foundations are poured and the first row of blocks is laid. Everything above depends on it, so we check it twice and film it for you.

WEEKS 10–30
03
Columns and floor slabs rise. By week 20 you can see the shape of every room, and from upstairs the view is real.

WEEKS 30–44
04
Walls, roof and glass. The house becomes weathertight and the inside work can start whatever the weather.

WEEKS 44–66
05
Lime plaster, oak, stone floors, the kitchen, the pool and the garden. You choose finishes from samples we post to you.

WEEK 72
06
We walk you round, room by room, and hand over the keys, the manuals and a year of care for anything that needs fixing.

Questions
Yes, until the end of the Ground stage. Each villa starts from a design made for its plot, and we adjust rooms, finishes and the pool with you before we pour anything.
You get a date for your keys before we start, and your weekly diary shows exactly where things stand. In a real contract, delay terms would be written in.
No. Most owners visit once at the start and once at handover. Everything in between comes to you: photos, films, samples and calls.
Any time, with your site manager. Hard hats are on us.
In stages tied to the build: a deposit to reserve, then payments at First course, Frame, Close in and Keys. A real offer would set this out in full.